Top 150+ Solved Business Policy and Project Management MCQ Questions Answer

From 91 to 105 of 122

Q. In _________ stage, the entry, exit and process requirements areidentified for each activity.

a. review and publicize plan.

b. identify project scope and objectives.

c. analyse project.

d. identify the products and activities of the project.

  • d. identify the products and activities of the project.

Q. ___________ is also a part of design modelling.

a. user interface design.

b. testing.

c. behaviour model.

d. analysis.

  • a. user interface design.

Q. Deployment diagrams illustrate the ________ view of the system.

a. dynamic.

b. behavioural.

c. activities.

d. static.

  • a. dynamic.

Q. The problems experienced in the survey of managers published by Thayer,Pyster and Wood include_________.

a. poor estimates and plans.

b. poor role definition.

c. poor quality control.

d. both a and b.

  • d. both a and b.

Q. PRINCE means _____________

a. projects in combined energy

b. projects in controlled energy

c. projects in combined environments.

d. projects in controlled environments

  • d. projects in controlled environments

Q. Which forms the basis for management control of software project?

a. methods.

b. tools.

c. process.

d. quality focus.

  • c. process.

Q. Requirements engineering provides the mechanism for _________.

a. understanding custom needs.

b. assessing facility.

c. analyzing need.

d. all of the above .

  • d. all of the above .

Q. When a customer does not identify a detailed input, processing or outputrequirements, _______ model is used.

a. prototyping.

b. rad.

c. incremental.

d. spiral.

  • a. prototyping.

Q. Projects lies between ___________.

a. job & exploration

b. methods & process

c. quality & quantity

d. tool& process

  • a. job & exploration

Q. Expand the mnemonic SMART _________________

a. specific, measurable, achievable, relevant, time constrained.

b. system, measurable, achievable, relevant, time constrained.

c. specific, measurable, archive, relevant, time constrained.

d. specific, measurable, archive, relevant, target.

  • a. specific, measurable, achievable, relevant, time constrained.

Q. ……………..is called if subsequent have the time by which an activity may bedelayed without affecting.

a. action float.

b. terminal float.

c. free float

d. null float

  • c. free float

Q. _________ activities on the network diagram have zero duration and useno resources.

a. dangling.

b. dummy.

c. null.

d. zero.

  • b. dummy.

Q. ____________is part of Risk Management.

a. risk analysis and risk estimation.

b. risk control and risk planning.

c. risk identification and monitoring.

d. risk control, planning, identification and monitoring.

  • d. risk control, planning, identification and monitoring.