Top 150+ Solved Business Policy and Project Management MCQ Questions Answer

From 61 to 75 of 122

Q. Which of the following is NOT part of a software quality assurance plan?

a. reference documents.

b. configuration action.

c. supplier control.

d. customer control.

  • c. supplier control.

Q. Who is NOT usually present in a technical review?

a. user.

b. quality engineer.

c. the programming tools supplier.

d. specialist with knowledge of the application.

  • c. the programming tools supplier.

Q. The expectancy theory of motivation will focus on ________.

a. instrumentality.

b. reliability.

c. reward.

d. assignment specification.

  • a. instrumentality.

Q. Herzberg's theory is ________.

a. 3-factor theory.

b. 6-factor theory.

c. 2-factor theory.

d. 1-factor theory.

  • c. 2-factor theory.

Q. The saying "Cannot see the wood for the trees" is associated with ______.

a. information superhighway.

b. information overload.

c. information under load.

d. assumption.

  • b. information overload.

Q. Closing the project involves _______.

a. identifying next project.

b. identifying the future ventures.

c. identifying the faults.

d. identifying follow-on actions.

  • d. identifying follow-on actions.

Q. Ensuring that all the loose ends of a project are tied up is called as___________.

a. demanding.

b. decomposing.

c. determining.

d. decommissioning.

  • d. decommissioning.

Q. A Quality specification is otherwise known as ____________.

a. allocation specification.

b. alternate specification.

c. attribute specification.

d. assignment specification.

  • a. allocation specification.

Q. USDP means ________.

a. unified software development process

b. uniform software development process

c. union software development process

d. union software deployment process

  • a. unified software development process

Q. The percentage of a particular time interval that a system is usable iscalled _____.

a. time interval.

b. availability.

c. utility.

d. mean time.

  • b. availability.

Q. BS EN ISO 9001:2000 is a _____.

a. external standard.

b. internal standard.

c. cmm standard.

d. tuv standard

  • a. external standard.

Q. CMM is acronym of __________.

a. capability maturity model.

b. calculative maturity model.

c. collaborative maturity model.

d. continuous maturity model.

  • a. capability maturity model.

Q. The inspection is led by ________, who has had specific training in thetechnique.

a. an evaluator.

b. a testing professional.

c. a moderator.

d. a reader.

  • c. a moderator.

Q. Clean-room software development is created by _______.

a. henry mills.

b. henry ford.

c. john mills.

d. harlan mills.

  • d. harlan mills.

Q. _________ is a technique particularly associated with quality circles.

a. quality plans.

b. fire- fighting.

c. quality checking.

d. brain storming.

  • d. brain storming.
Subscribe Now

Get All Updates & News