Q. ____ is carried out to calculate the earliest dates on which each activitymay be started and completed.

a. backward pass.

b. forward pass.

c. no pass.

d. increasing pass.

  • b. forward pass.

Q. . In software prototype, partial working model is classified into ________.

a. vertical and horizontal.

b. vertical and straight.

c. bended and horizontal.

d. elevated and horizontal.

  • a. vertical and horizontal.

Q. . The scope of the deliverables for an increment is rigidly constrained by anagreed deadline called as ____________.

a. sand boxing.

b. time boxing.

c. time delaying.

d. local delaying.

  • b. time boxing.

Q. . SSADM means ___________.

a. straight systems analysis design method.

b. structured systems analysis design method.

c. software systems analysis design method.

d. solutions systems analysis design metho

  • b. structured systems analysis design method.

Q. Sometimes redesigns of the code is often called as ________.

a. refactoring.

b. redesigning.

c. recoding.

d. rearranging.

  • a. refactoring.

Q. Find the two levels of development suggested by Booch ?

a. micro and macro processes.

b. inter and intra processes.

c. internal and external processes.

d. small and large processes.

  • a. micro and macro processes.

Q. ________ is refined by Barry Boehm and his co-workers.

a. cocomo iii.

b. cocomo iv.

c. cocomo ii.

d. cocomo i.

  • b. cocomo iv.

Q. CPM can be expanded as _______.

a. control path method.

b. critical path method.

c. cohesion path method.

d. control path model.

  • b. critical path method.

Q. he Cost Benefit Analysis is done for ___________ feasibility.

a. social

b. technical.

c. programm

d. economical.

  • d. economical.

Q. One can_______ is classified into Functional and Non-functional.

a. project.

b. requirements.

c. start date. .

d. risk

  • b. requirements.

Q. Security (backups, firewall) will be a ________ requirement.

a. functional.

b. non-functional.

c. normal.

d. security.

  • b. non-functional.

Q. Time behaviour is the sub-characteristics of _______.

a. maintainability.

b. efficiency.

c. usability.

d. reliability.

  • b. efficiency.

Q. _________ indicates the connectedness of the system that can be derivedmechanically.

a. dependency.

b. re-occurrence.

c. inheritance

d. relationship.

  • d. relationship.