Q. The minimum width of a septic tank is taken

a. 70 cm

b. 75 cm

c. 80 cm

d. 90 cm

  • b. 75 cm

Q. Pick up the item whose weight is added to the weight of respective item, is

a. cleats

b. brackets

c. bolts

d. all the above

  • d. all the above

Q. The expected out turn for earth work in excavation in ordinary soil per workman per day is

a. 1.00 cum

b. 2.00 cum

c. 3.00 cum

d. 4.00 cum

  • c. 3.00 cum

Q. The brick work is measured in sq metre, in case of

a. honey comb brick work

b. brick flat soling

c. half brick walls or the partition

d. all the above

  • d. all the above

Q. The height of the sink of wash basin above floor level is kept

a. 60 cm

b. 70 cm

c. 75 cm to 80 cm

d. 80 cm

  • c. 75 cm to 80 cm

Q. The item of steel work which is measured in sq.m, is

a. collapsible gates

b. rolling shutters

c. ventilators and glazing

d. all the above

  • d. all the above

Q. The damp proof course (D.P.C.) is measured in

a. cub. m

b. sq. m

c. metres

d. none of these

  • b. sq. m

Q. The volume is measured correct to the nearest

a. 0.01 cum

b. 0.02 cum

c. 0.03 cum

d. 0.04 cum

  • a. 0.01 cum

Q. Size, capacity and materials need be specified for

a. bib-cocks

b. stop-cocks

c. ball valves

d. all the above

  • d. all the above

Q. The expected out turn of half brick partition wall per mason per day is

a. 1.5 m3

b. 2.0 m3

c. 4.0 m2

d. 5.0 m2

  • b. 2.0 m3

Q. The floor area includes the area of the balcony up to

a. 100 %

b. 75 %

c. 50 %

d. 25 %

  • c. 50 %

Q. The slope of the outlet of 'P trap' below the horizontal is kept

a. 8°

b. 10°

c. 12°

d. 14°

  • d. 14°