Request New Subject
Home
Civil Engineering
Estimating and Costing
Q. Size, capacity and materials need be specified for (Solved)
1. bib-cocks
2. stop-cocks
3. ball valves
4. all the above
d. all the above
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe