Top 80+ Solved Estimating and Costing MCQ Questions Answer

From 1 to 15 of 77

Q. The rate of payment is made for 100 cu m (per % cu m) in case of

a. earth work in excavation

b. rock cutting

c. excavation in trenches for foundation

d. all the above

  • d. all the above

Q. The rate of an item of work depends on

a. specifications of works

b. specifications of materials

c. proportion of mortar

d. all the above

  • d. all the above

Q. The main factor to be considered while preparing a detailed estimate, is

a. quantity of the materials

b. availability of materials

c. transportation of materials

d. all the above

  • d. all the above

Q. Brick walls are measured in sq. m if the thickness of the wall is

a. 10 cm

b. 15 cm

c. 20 cm

d. none of these

  • a. 10 cm

Q. The plinth area of a building not includes

a. area of the walls at the floor level

b. internal shaft for sanitary installations up to 2 sq m. in area

c. lift and wall including landing

d. area of cantilevered porch

  • d. area of cantilevered porch

Q. While estimating the qualities for the construction of a building, the correct metric unit is

a. metre for length

b. cubic metre for area

c. square metres for volume

d. litre for capacity

  • d. litre for capacity

Q. The brick work is not measured in cu m in case of

a. one or more than one brick wall

b. brick work in arches

c. reinforced brick work

d. half brick wall

  • d. half brick wall

Q. The assumption on which the trapezoidal formula for volumes is based, is

a. the end sections are parallel planes

b. the mid-area of a pyramid is half the average area of the ends

c. the volume of the prismoidal is over-estimated and hence a prismoidal correction is applied

d. all the above

  • d. all the above

Q. In the mid-section formula

a. the mean depth is the average of depths of two consecutive sections

b. the area of mid-sections is calculated by using mean depth

c. the volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections

d. all of the above

  • d. all of the above

Q. The cross-sections for a highway is taken at

a. right angle to the centre line

b. 30 metres apart

c. intermediate points having abrupt change in gradient

d. all the above

  • d. all the above

Q. Referring of given figure, pick up the correct statement from the following:

a. the total length of centre line of four walls is 20 m

b. length of long wall out-to-out is 6.80 m

c. length of short walls in-to-in is 3.20 m

d. all the above

  • d. all the above

Q. According to Indian Standards Institute, the actual size of modular bricks is

a. 23 cm × 11.5 cm × 7.5 cm

b. 25 cm × 13 cm × 7.5 cm

c. 19 cm × 9 cm × 9 cm

d. 20 cm × 10 cm × 10 cm

  • c. 19 cm × 9 cm × 9 cm

Q. The following item of earth work is not measured separately.

a. setting out of works

b. site clearance

c. steps in deep excavation

d. all the above

  • d. all the above