Top 80+ Solved Estimating and Costing MCQ Questions Answer

From 16 to 30 of 77

Q. The measurement is made in square metre in case of

a. cement concrete in foundation

b. r.c.c. structure

c. hollow concrete block wall

d. none of these

  • d. none of these

Q. Cost of fittings and their fixing is specified for the following sanitary fittings

a. water closets

b. flushing pipes

c. lavatory basins

d. all the above

  • d. all the above

Q. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30cm, is termed as

a. excavation

b. surface dressing

c. cutting

d. surface excavation

  • d. surface excavation

Q. For the construction of buildings, the subheads of the estimate are

a. earthwork, concrete work, brick work

b. brickwork, stone work, roofing

c. brickwork flooring, wood work, steel work

d. all the above

  • d. all the above

Q. The cross-section of a road partly in banking and partly in cutting is shown in the given figure. Thearea of the shaded portion is

a. b - rd)²/(r - s)

b. b - rd)²/(r + s)

c. ½ × (b + rd)²/(r - s)

d. b - rd)²/(s - r)

  • a. b - rd)²/(r - s)

Q. Pick up the incorrect statement from the following:

a. no deduction is made for the volume occupied by reinforcement

b. no deduction is made for the openings upto 0.1 sq.m

c. no deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in crosssection

d. none of these

  • d. none of these

Q. The value of 'B' of Indian type W.C. shown in the given figure is:

a. 45 cm

b. 50 cm

c. 30 cm

d. 25 cm

  • a. 45 cm

Q. Pick up the excavation where measurements are made in square metres for payment.

a. ordinary cuttings up to 1 m

b. surface dressing up to 15 cm depths

c. surface excavation up to 30 cm depths

d. both (b) and (c)

  • d. both (b) and (c)

Q. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita perminute, is taken

a. 1.80 litres for 5 to 10 users

b. 1.20 litres for 15 users

c. 1.35 for 20 users

d. all the above

  • d. all the above

Q. In long and short wall method of estimation, the length of long wall is the centre to centredistance between the walls and

a. breadth of the wall

b. half breadth of wall on each side

c. one fourth breadth of wall on each side

d. none of these

  • b. half breadth of wall on each side

Q. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

a. 1.5 m3

b. 2.5 m3

c. 3.5 m3

d. 5.0 m3

  • d. 5.0 m3

Q. The value of 'C' of Indian type W.C. shown in the given figure is:

a. 400 mm

b. 450 mm

c. 500 mm

d. 550 mm

  • c. 500 mm

Q. The area is measured correct to the nearest

a. 0.01 sqm

b. 0.02 sqm

c. 0.03 sqm

d. 0.04 sqm

  • a. 0.01 sqm

Q. The measurement is not made in square metres in case of

a. d.p.c. (damp proof course)

b. form works

c. concrete jeffries

d. r.c. chhajja

  • d. r.c. chhajja

Q. The value of 'A' of Indian type W.C. shown in the given figure is:

a. 25 cm

b. 30 cm

c. 40 cm

d. 45 cm

  • b. 30 cm