Q. The rate of payment is made for 100 cu m (per % cu m) in case of (Solved)
1. earth work in excavation
2. rock cutting
3. excavation in trenches for foundation
4. all the above
- d. all the above
1. earth work in excavation
2. rock cutting
3. excavation in trenches for foundation
4. all the above