Request New Subject
Home
Civil Engineering
Estimating and Costing
Q. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cementrequired, is (Solved)
1. 0.200 m3
2. 0.247 m3
3. 0.274 m3
4. 0.295 m3
c. 0.274 m3
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe