Top 150+ Solved Operations Management and Strategic Management MCQ Questions Answer
Q. Out of the following trends in production/operations management, which one issometimes called as agile manufacturing?
a. Re-engineering
b. Supply-Chain Management
c. Lean Production
d. Flexibility
Q. Out of the following factors that are affecting Capacity Planning, which one is LessControllable one?
a. Machine break-downs
b. Amount of labour employed
c. Facilities installed
d. Shifts of work per day
Q. Which of the following stages of Product Life Cycle does attribute beginning ofsubstantial increase in Sales and Profits?
a. Introduction
b. Growth
c. Maturity
d. Decline
Q. Which one is NOT an index of Productivity?
a. Man-hour output
b. Productivity ratio
c. TQM
d. Use of Financial Ratios
Q. The time by which an activity can be rescheduled without affecting the otheractivities - preceding or succeeding is called as
a. Slack
b. Independent Float
c. Free Float
d. Total Float
Q. Reliability and per unit cost of which of the following spares are less?
a. Regular spares
b. Insurance spares
c. Capital spares
d. Rotable spares
Q. The lead-time is the time:
a. To place holders for materials
b. Time of receiving materials
c. Time between receipt of material and using materials,
d. Time between placing the order and receiving the materials
Q. The method used in scheduling a project is:
a. A schedule of break-down of orders
b. Outline master programme
c. PERT & CPM
d. Schedule for large and integrated work
Q. MRP stands for:
a. Material requirement planning
b. Material reordering planning
c. Material requisition procedure
d. Material recording procedure
Q. One of the important charts used in programme control is:
a. Material chart
b. Gantt chart
c. Route chart
d. Inspection chart
Q. Variety reduction is generally known as:
a. Less varieties
b. Simplification
c. Reduced varieties
d. None of the above
Q. Conversion of inputs into outputs is known as:
a. Application of technology
b. operations management
c. Manufacturing products
d. product
Q. Number of product varieties that can be manufactured in Mass production is:
a. One only
b. Two only
c. Few varieties in large volumes
d. Large varieties in small volumes
Q. Routing and Scheduling becomes relatively complicated in
a. Job production
b. Batch production
c. Flow production
d. Mass production
Q. JIT stands for
a. Just in time purchase
b. Just in time production
c. Just in time use of materials
d. Just in time order the material