Top 150+ Solved Operations Management and Strategic Management MCQ Questions Answer
Q. The quantities for which the planner has to prepare production plan are known as:
a. Optimal quantity of products
b. Material planning
c. Quantity planning
d. Planning quantity standards.
Q. The document, which is used to show planning quantity standards and productionplan, is known as:
a. Planning specifications
b. Route sheet
c. Bill of materials
d. Operation sheet
Q. In solving a problem on LOB, the number of workstations required is given by:
a. Cycle time/Total time
b. Cycle time/Element time
c. Total time/Element time
d. Total time/ Cycle time.
Q. Final stage of production planning, where production activities are coordinated andprojected on a time scale is known as:
a. Scheduling
b. Loading
c. Expediting
d. Routing
Q. The study of relationship between the load on hand and capacity of the work centersis known as:
a. Scheduling
b. Loading
c. Routing
d. Controlling
Q. One of the aims of loading is:
a. To finish the job as early as possible
b. To minimise the material utilization
c. To improve the quality of product
d. To keep operator idle time, material waiting time and ancillary machine time at
Q. One of the principles of Scheduling is:
a. Principle of optimal product design
b. Principle of selection of best material
c. Principle of optimal operation sequence
d. Principle of optimal cost.
Q. One of the requirements of Aggregate Planning is:
a. Both output and sales should be expressed in a logical overall unit of measuring
b. Appropriate time period
c. List of all resources available
d. List of operations require
Q. In aggregate planning, one of the methods in modification of demand is:
a. Differential Pricing
b. Lay off of employees
c. Over time working
d. Sub contracting.
Q. In aggregate planning one of the methods used to modification of supply is:
a. Advertising and sales promotion
b. Development of complimentary products
c. Backlogging
d. Hiring and lay off of employees depending on the situation.
Q. The first stage of Production control is:
a. Dispatching
b. Scheduling
c. Routing
d. Triggering of production operations and observing the progress and record the
Q. One of the important production documents is:
a. Design sheet of the product
b. List of materials
c. Route card
d. Control chart
Q. The way in which we can assess the efficiency of the production plant is by:
a. Efficient dispatching
b. By manufacturing a good product
c. By comparing the actual performance with targets specified in the specified programme
d. By efficient production planning.
Q. Production control concerned with:
a. Passive assessment of plant performance
b. Strict control on labours
c. Good materials management
d. Good product design
Q. When work centers are used in optimal sequence to do the jobs, we can:
a. Minimise the set up time
b. Minimse operation time
c. Minimise the breakdown of machines
d. Minimise the utility of facility.