Q. The risk or probability of incorrectly concluding that the conversionprocess is out of control. (Solved)
1. type 1 error
2. type 2 errors
3. (a) and (b)
4. none of these
- a. type 1 error
1. type 1 error
2. type 2 errors
3. (a) and (b)
4. none of these