Q. ………………is a measure the actual level of output for a process or activityover a period of time. (Solved)
1. actual capacity
2. design capacity
3. maximum capacity
4. none of these
- a. actual capacity
1. actual capacity
2. design capacity
3. maximum capacity
4. none of these