Top 550+ Solved Total Quality Management (TQM) MCQ Questions Answer

From 466 to 480 of 511

Q. Lots for acceptance sampling should be ______________ and ______________.

a. Homogeneous, Large

b. Heterogeneous, Small

c. Homogeneous, Small

d. Heterogeneous, Large

  • a. Homogeneous, Large

Q. The roof of house of quality shows the interrelationship between:

a. Functional Requirements

b. Design Attributes

c. Service Process

d. Manufacturing Process

  • b. Design Attributes

Q. X bar charts are uses to control the ______________ of a process.

a. Dispersion

b. Central tendency

c. None of the above

d. Both a and b

  • b. Central tendency

Q. The chart used for tracking number non-conforming is:

a. P

b. Np

c. X bar

d. None of the above

  • b. Np

Q. For a c chart, the OC curve plots the ______________ against ______________.

a. Probability of Type 2 error, true mean number of defects

b. Probability of Type 1 error, true mean number of defects

c. Probability of Type 1 error, true total number of defects

d. Probability of Type 2 error, true total number of defects

  • a. Probability of Type 2 error, true mean number of defects

Q. Identification of customers and listening to the Voice of Customer (VoC) are a part of:

a. Quality Assurance

b. Quality Planning

c. Quality Control and Improvement

d. Quality Execution

  • b. Quality Planning

Q. Ease of repair is associated with ______________ dimension of quality.

a. Serviceability

b. Performance

c. Durability

d. Perceived Quality

  • a. Serviceability

Q. Two major components of fitness of use are Quality of Design and ______________.

a. Quality of Conformance

b. Quality of Service

c. Quality of Specification

d. none

  • a. Quality of Conformance

Q. For new product development, the chosen methodology should be

a. DMADV

b. DMAIC

c. Structured Design Methodology

d. DMIE

  • a. DMADV

Q. The Operating characteristic curve shows the relationship between the probability ofacceptance (on y axis) and ______________ (on x axis).

a. Proportion defective

b. Proportion acceptable

c. Number of lots

d. Size of lot

  • a. Proportion defective

Q. While random variability in a system can be removed by ______________, non-randomvariability requires ______________.

a. Operator or management action, Improvement in the system

b. Improvement in the system, operator or management action

c. Statistical Quality Control, Quality Checks

d. None of the above

  • b. Improvement in the system, operator or management action
Subscribe Now

Get All Updates & News