Top 150+ Solved Construction Project Management MCQ Questions Answer

From 121 to 135 of 149

Q. ................is provided to safeguard scaffolding against overturning.

a. Standards

b. Inclined rackers

c. Put-logs

d. Rails

  • b. Inclined rackers

Q. Wooden ladders should be inspected at least........... a month.

a. Once

b. Twice

c. Three times

d. Four times

  • a. Once

Q. In sheds for ceiling works, ......................... scaffolding is economical.

a. Suspended

b. Needle

c. Ordinary

d. None of the above

  • a. Suspended

Q. For repair works at high level of multistoreyed buildings needle scaffolding is preferred

a. As it is more stable

b. As it looks better

c. As it will not obstruct traffic at ground level.

d. None of the above

  • c. As it will not obstruct traffic at ground level.

Q. PPE stands for

a. Personal protective equipment

b. Preferred protective equipment

c. Prohibited protective equipment

d. None of the above

  • a. Personal protective equipment

Q. For work at height one should use

a. Safety belt

b. Full body harness

c. none

d. all

  • b. Full body harness

Q. Who plays a crucial role in convincing the operating staff to adopt the change?

a. HRD manager

b. Junior engineer

c. Public relation officer

d. Supervisor

  • d. Supervisor

Q. Supervisor is at the lowest level of management

a. Right

b. Wrong

c. none

d. all

  • a. Right

Q. ............. has 3 roles ;Trainer,Motivator and Facilitator

a. HRD manager

b. Junior engineer

c. Public relation officer

d. Supervisor

  • d. Supervisor

Q. HRD is mainly concerned with

a. Optimum stress

b. Optimum cost

c. Optimum duration

d. None of the above

  • a. Optimum stress

Q. Which one of the following is not a system of HRD

a. Optimization of resources system

b. Appraisal system

c. Carrier system

d. Training System

  • a. Optimization of resources system
Subscribe Now

Get All Updates & News