Q. _________ is stated as a budget which is made to change as per the levels of activity attained. (Solved)
1. Fixed budget
2. Flexible budget
3. Both a and b
4. None of the above
- b. Flexible budget
1. Fixed budget
2. Flexible budget
3. Both a and b
4. None of the above