Q. The information to prepare a flexible budget includes: (Solved)

1. Total fixed cost, total variable cost

2. Total fixed cost, total variable cost and capacity base

3. Unit fixed cost and unit variable cost

4. Total fixed cost, variable cost per unit, several levels of activity

  • d. Total fixed cost, variable cost per unit, several levels of activity