Q. If NPV for a project is negative, then (Solved)
1. IRR = Cost of capital
2. IRR > Cost of capital
3. BCR = 1
4. IRR < Cost of capital
- d. IRR < Cost of capital
1. IRR = Cost of capital
2. IRR > Cost of capital
3. BCR = 1
4. IRR < Cost of capital