Q. Maximum possible time to complete an activity is ---------. (Solved)
1. Pessimistic time
2. Optimistic time
3. Most likely time
4. None of these.
- a. Pessimistic time
1. Pessimistic time
2. Optimistic time
3. Most likely time
4. None of these.