Q. A flexible budget is prepared for a _. (Solved)
1. One level of activity.
2. Range of activity.
3. Two level of activity.
4. Three level of activity.
- b. Range of activity.
1. One level of activity.
2. Range of activity.
3. Two level of activity.
4. Three level of activity.