Q. Liquidated damages means an amount of the _________ that may result from the breach ofcontract (Solved)
1. actual loss
2. loss suffered
3. pre-estimated probable loss
4. pre-estimated actual loss
- c. pre-estimated probable loss
1. actual loss
2. loss suffered
3. pre-estimated probable loss
4. pre-estimated actual loss