Top 150+ Solved Irrigation Engineering MCQ Questions Answer

From 181 to 195 of 198

Q. An outlet in which the discharge depends upon the difference in level between the water levels in distributing channel and the water course, is known as

a. non-modular outlet

b. semi-module outlet

c. modular outlet

d. rigid module

  • a. non-modular outlet

Q. The river training works are adopted on a river

a. to pass high flood discharge safely and quickly through the breach

b. to direct and guide the river flow

c. to reduce bank erosion to a minimum

d. all of the above

  • d. all of the above

Q. The gap or margin of height, between full supply level (F.S.L.) and top of the bank is called

a. free board

b. dowel

c. inspection roadway

d. berm

  • a. free board

Q. The optimum depth of kot watering is 19 cm for

a. wheat

b. sugar-cane

c. rice

d. cotton

  • c. rice

Q. The width of meandering belt is the

a. transverse distance between the apex point of one curve and apex point on reverse curve

b. axial distance along the river between tangent point of one curve and tangent point of other curve of same order

c. axial distance along the river between the apex point of one curve and apex point on reverse curve

d. transverse distance along the river between tangent point of one curve and tangent point of other curve of same order

  • a. transverse distance between the apex point of one curve and apex point on reverse curve

Q. The function of a scouring sluice is

a. to control the silt entry into the canal

b. to scour the silt deposited in the river bed above the approach channel

c. to pass the low floods without dropping the shutters of the main weir

d. all of the above

  • d. all of the above

Q. In case of syphon aqueduct, the H.F.L. of the drain is

a. much below the bottom of the canal trough

b. much higher above the canal bed

c. in level with the canal bed

d. none of the above

  • b. much higher above the canal bed

Q. A canal head work in rocky stage of a river is not suitable because

a. more cross drainage works are required

b. a costly head regulator is required

c. more falls are necessary to dissipate the energy

d. all of the above

  • d. all of the above

Q. Non-silting, non-scouring velocity is called

a. mean

b. critical

  • b. critical

Q. Sprinklar irrigation is adopted for

a. level

b. uneven

  • b. uneven
Subscribe Now

Get All Updates & News