Q. A canal head work in rocky stage of a river is not suitable because (Solved)

1. more cross drainage works are required

2. a costly head regulator is required

3. more falls are necessary to dissipate the energy

4. all of the above

  • d. all of the above
Subscribe Now

Get All Updates & News