Request New Subject
Home
Civil Engineering
Irrigation Engineering
Q. The gap or margin of height, between full supply level (F.S.L.) and top of the bank is called (Solved)
1. free board
2. dowel
3. inspection roadway
4. berm
a. free board
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe