Top 150+ Solved Estimation, Costing and Valuation Engineering MCQ Questions Answer
Q. is required for preliminary studies of various aspects of a work or project.
a. supplementary estimate
b. plinth area estimate
c. revised estimate
d. abstract estimate
Q. Which of the following are parameters involved in computing the total cost of a software development project?
a. hardware and software costs
b. effort costs
c. travel and training costs
d. all of the mentioned
Q. Which of the following costs is not part of the total effort cost?
a. costs of networking and communications
b. costs of providing heating and lighting office space
c. costs of lunch time food
d. costs of support staff
Q. What is related to the overall functionality of the delivered software?
a. function-related metrics
b. product-related metrics
c. size-related metrics
d. none of the mentioned
Q. A is developed using historical cost information that relates some software metric to the project cost.
a. algorithmic cost modelling
b. expert judgement
c. estimation by analogy
d. parkinson’s law
Q. What type of cyber-crime, its laws and punishments does section 66 of the Indian IT Act holds?
a. cracking or illegally hack into any system
b. putting antivirus into the victim
c. stealing data
d. stealing hardware components
Q. involves the preparation of tenders based on a typical or notional bill of quantities or schedule of works.
a. framework tendering
b. selective tendering
c. negotiated tendering
d. serial tendering
Q. tendering is used when all the information necessary to calculate a realistic price is available when tendering commences.
a. single-stage
b. double-stage
c. framework
d. serial
Q. An invitation to tender might not include?
a. holiday packages
b. preliminarie
c. a letter of invitation to tender
d. design drawing
Q. The heavy particles in the tank
a. float
b. sink into the bottom
c. separated using magnetic methods
d. flow along liquid
Q. Which of the following methods are not used for the dispersion of the effluent out of a septic tank?
a. wetlands
b. soak pit
c. evapo-transpiration mound
d. leach field
Q. The first chamber in a septic tank should be at least of the total length.
a. 10 %
b. 20 %
c. 35 %
d. 50 %
Q. Which of the following reasons is correct with respect to the need of providing baffle walls?
a. mixing of scum and wastewater
b. settling of heavy particles
c. increase velocity of the liquid
d. prevent scum and solids from escaping