Request New Subject
Home
Civil Engineering
Estimation, Costing and Valuation Engineering
Q. The first chamber in a septic tank should be at least of the total length. (Solved)
1. 10 %
2. 20 %
3. 35 %
4. 50 %
d. 50 %
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe