Top 150+ Solved Estimation, Costing and Valuation Engineering MCQ Questions Answer
Q. Much of the information necessary to create a behavioral model can be obtained by observing the external manifestation of the existing
a. candidate keys
b. interface
c. database structure
d. none of the mentioned
Q. Extracting data items and objects, to get information on data flow, and to understand the existing data structures that have been implemented is sometimes called
a. data analysis
b. directionality
c. data extraction
d. client applications
Q. is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.
a. prime cost
b. provisional sum
c. capital cost
d. building cost index
Q. In this method approx. total length of walls is found in running metre and this total length multiplied by the rate per running metre of wall gives a fairly accurate cost.
a. annual repair
b. item rate estimate
c. approximate quantity method estimate
d. cubical content estimate
Q. estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.
a. supplementary and revised estimate
b. maintenance estimate
c. item rate estimate
d. revised estimate
Q. A large work or project may consists of several building or small works and each of these work is known as
a. sub-work
b. sub-project
c. sub-head
d. sub-construction
Q. The term is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.
a. prime cost
b. hour-work
c. day-work
d. sub-work
Q. The surface of the highway pavement should be designed to allow
a. high rolling resistance
b. low rolling resistance
c. no rolling resistance
d. very high rolling resistance
Q. Which of the following pavement has greater life?
a. bituminous pavements
b. cement concrete pavements
c. gravel roads
d. earth roads
Q. Which of the following requirement is given most importance in highway design?
a. structural
b. functional
c. seasonal
d. maintenance
Q. The surface of the pavement should be
a. smooth
b. rough
c. sufficient enough to resist skid
d. very rough