Top 150+ Solved Construction Quality Control and Monitoring MCQ Questions Answer

From 121 to 135 of 146

Q. Which of the following diagram is represent relationship between causes & effect.

a. C & E diagram

b. Scatter diagram

c. Histogram

d. Pareto diagram

  • a. C & E diagram

Q. Which of the following type of chart is to systematic way of recording data?

a. C & E diagram

b. Scatter diagram

c. Check list

d. Pareto diagram

  • c. Check list

Q. Which of the following type of diagram is helps to analyzing the relationship between twovariables?

a. C & E diagram

b. Scatter diagram

c. Check list

d. Pareto diagram

  • b. Scatter diagram

Q. Pareto diagram is given by ___

a. Dr. Ishikawa

b. Dr. Joseph Juran

c. Vilfredo Pareto

d. Dr. Mark Crossby

  • c. Vilfredo Pareto

Q. C & E diagram is given by___.

a. Dr. Ishikawa

b. Dr. Joseph Juran

c. Vilfredo Pareto

d. Dr. Mark Crossby

  • a. Dr. Ishikawa

Q. Which of the following methods of statistical quality control?

a. Frequency distribution

b. Control chart

c. Acceptance sampling

d. All of the above

  • d. All of the above

Q. In frequency distribution method is find only ____

a. Variations

b. Frequency

c. Both A and B

d. None of the above

  • c. Both A and B

Q. In which of the following characteristics are for frequency distribution?

a. Central tendency

b. Spread

c. Both A and B

d. None of the above

  • c. Both A and B

Q. Which of the following measures are not included in central tendency?

a. Range & Standard deviation

b. Mean, Median & Mode

c. Both A and B

d. None of the above

  • a. Range & Standard deviation

Q. Which of the following measures are included spread?

a. Range

b. Standard deviation

c. Both A and B

d. None of the above

  • c. Both A and B

Q. Largest frequency of the variable is called to___

a. Mean

b. Mode

c. Median

d. None of the above

  • b. Mode

Q. Find out mode for 11, 12, 14, 14, 17, 18 ?

a. 11

b. 18

c. 14

d. 14.5

  • c. 14
Subscribe Now

Get All Updates & News