Q. Which of the following is a disadvantage of green building?

a. Increases 15-20% cost as compared to normal building

b. Modern techniques are required

c. Experts technicians are required

d. All of the above

  • d. All of the above

Q. Which of the following is not a green building component?

a. Water efficiency

b. Design efficiency

c. Material efficiency

d. None of the above

  • d. None of the above

Q. Which of the following benefit is for green building material?

a. Lower cost

b. Reduced maintenance cost

c. Greater design flexibility

d. All of the above

  • d. All of the above

Q. Which of the following green rating systems are currently working in India?

a. LEED

b. GRIHA

c. Both A and B

d. None of the above

  • c. Both A and B

Q. What are the three pillars of TQM?

a. Vision , Team work , Communication

b. Foundation , Pillars , The top

c. Total , Quality , Management

d. Understanding , Improvement , Assurance

  • d. Understanding , Improvement , Assurance

Q. Zaire proposed "building blocks of TQM"?

a. True

b. False

c. none

d. all

  • a. True

Q. Zaire proposed "Building blocks of TQM" in which year ?

a. 1990

b. 1991

c. 1992

d. 1993

  • b. 1991

Q. Proposed "The house of TQM models” in which year?

a. 1990

b. 1991

c. 1992

d. 1993

  • d. 1993

Q. Foundation, Pillars & the top three proposed in which TQM model?

a. Building blocks of TQM

b. The house of TQM

c. Driving forces of TQM

d. Organization Structure of TQM

  • a. Building blocks of TQM

Q. Which of the following is not included in the driving force of TQM?

a. Survival

b. Export Drive

c. Import

d. Profitability

  • c. Import

Q. Give full form of P.D.C.A cycle

a. Planning , Doing , Checking , Acting

b. Plan , Do , Check , Act

c. Plan, Does , Check , Act

d. Plan , Do , Checks, Acts

  • b. Plan , Do , Check , Act

Q. Who's suggested PDCA cycle?

a. Shewhart

b. Deming

c. Newton

d. Juran

  • b. Deming

Q. In machine mixing gap between drum & blades shall not be more than ____

a. 20 mm

b. 30 mm

c. 15 mm

d. 25 mm

  • d. 25 mm

Q. Batching error means inaccuracy in the quantity of

a. Aggregates

b. Cement

c. Water

d. All the above

  • d. All the above

Q. The Curing periods depends upon

a. Type of cement

b. Weather Conditions

c. Methods of curing

d. All of the above

  • d. All of the above