Q. What is the meaning of EMS?

a. Environmental Management Systems

b. Environmental Monitoring Systems

c. Environmental Management Standards

d. Environmental Monitoring Standards

  • a. Environmental Management Systems

Q. Which of the following standard is used for Environmental Management Systems

a. ISO 14001

b. ISO 14004

c. Both A and B

d. None of the Above

  • c. Both A and B

Q. The structure of ISO 14001 is based on the ____

a. Juran cycle

b. Deming Cycle

c. Pareto cycle

d. None of the Above

  • b. Deming Cycle

Q. Deming cycle is that ____

a. Plan – Do – Check - Act

b. Plan – Check – Act - Do

c. Plan – Do – Act - Check

d. Plan – Act – Check - Do

  • a. Plan – Do – Check - Act

Q. Which of the following ISO 14001 aims are?

a. Waste Prevention

b. Energy Conservation

c. Pollution Control

d. All of the Above

  • d. All of the Above

Q. Which of the following ISO 14000 benefits are?

a. Improve cost control

b. Limit liability

c. Protect human health

d. All of the Above

  • d. All of the Above

Q. LCA means that___

a. Life Cycle Assessment

b. Life Council Assessment

c. Life Cycle Association

d. Local Cycle Assessment

  • a. Life Cycle Assessment

Q. LCA associated with a___

a. Product

b. Process

c. Service

d. All of the above

  • d. All of the above

Q. Which of the following assessments is made by LCA throughout the life of a building?

a. Use of building

b. Transportation of construction material

c. Disposal of surplus waste material

d. All of the above

  • d. All of the above

Q. Which of the following phases is not a LCA process?

a. Life cycle inventory

b. Life cycle impact assessment

c. Life cycle interpretation

d. None of the above

  • d. None of the above

Q. Which of the following are not a benefits for LCA?

a. Does not improvement in the quality of environment

b. To know about Eco-friendly materials

c. Promotion to recycle and reuse of waste materials

d. None of the above

  • a. Does not improvement in the quality of environment

Q. Which of the following are not a measure for a green building?

a. Use B-rated elements that save energy

b. Install solar panels for lighting or heating water

c. Install water meters in a building

d. None of the above

  • d. None of the above

Q. Which of the following techniques are for statistical process control.

a. Check list

b. Scatter diagram

c. Pareto diagram

d. All of the above

  • d. All of the above