Q. PERT has the following time estimates (Solved)
1. No time estimates
2. One time estimate
3. Two time estimates
4. Three time estimates
5. None of the above
- d. Three time estimates
1. No time estimates
2. One time estimate
3. Two time estimates
4. Three time estimates
5. None of the above