Top 350+ Solved Software Testing and Quality Assurance (STQA) MCQ Questions Answer
Q. End result of Software Requirement Analysis is _.
a. functional and behavioral
b. architectural and structural
c. usability and reliability
d. algorithmic and data structure
Q. Bug status is set to postpone due to _.
a. priority of that bug may low.
b. lack of time for the release.
c. the bug may not be the major effect in the software.
d. data may be unavailable.
Q. Testing beyond normal operational capacity is _.
a. load testing
b. performance testing
c. stress testing
d. none
Q. 7n test cases are generated in which case of Boundary Value Analysis?
a. worst case
b. roust worst case
c. critical fault assumption
d. none
Q. Which testing is performed with Planning and Documentation?
a. ad-hoc testing
b. monkey testing
c. fuzz testing
d. end-to-end testing
Q. GUI means
a. graphical user interface
b. graphical user interaction
c. graphics uniform interaction
d. none
Q. First graphical user interface used commercially was introduced in
a. 1975
b. 1966
c. 1977
d. 1967
Q. What is/are the main component / components of user interface ?
a. presentation language
b. action language
c. a,b
d. none
Q. Which of the following model put much more emphasis on testing?
a. waterfall model
b. agile model
c. spiral model
d. v-v model
Q. Which of the following is / are types of Software Maintenance?
a. corrective
b. adaptive
c. perfective
d. all of the above
Q. Select which option is not true about SQA…?
a. audits and reviews to be performed by the team
b. amount of technical work to be performed
c. evaluations to be performed
d. documents that are produced by the sqa team.
Q. Which of the following is not included in prevention cost?
a. equipment calibration and maintenance
b. formal technical reviews
c. testequipment revie ws
d. quality planning review s