Q. Which of the following is not project management goal?

a. keeping overall costs within budget

b. delivering the software to the customer at the agreed time

c. maintaining a happy and well-functioning development team

d. avoiding customer complaints

  • d. avoiding customer complaints

Q. Which of the following is not considered as a risk in project management?

a. specification delays

b. product competition

c. testing

d. staff turnover

  • c. testing

Q. The process each manager follows during the life of a project is known as

a. project management

b. manager life cycle

c. project management life cycle

d. all of the mentioned

  • c. project management life cycle

Q. A 66.6% risk is considered as

a. very low

b. low

c. moderate

d. high

  • d. high

Q. Which of the following is/are main parameters that you should use when computing the costs of a software development project?

a. travel and training costs

b. hardware and software costs

c. effort costs (the costs of paying software engineers and managers)

d. all of the mentioned

  • d. all of the mentioned

Q. Quality planning is the process of developing a quality plan for

a. team

b. project

c. customers

d. project manager

  • b. project

Q. Which of the following is incorrect activity for the configuration management of a software system?

a. internship management

b. change management

c. version management

d. system management

  • a. internship management

Q. Identify the sub-process of process improvement

a. process introduction

b. process analysis

c. de-processification

d. process distribution

  • b. process analysis

Q. Which of these truly defines Software design?

a. software design is an activity subjected to constraints

b. software design specifies nature and composition of software product

c. software design satisfies client needs and desires

d. all of the mentioned

  • d. all of the mentioned

Q. Which of these describes stepwise refinement?

a. nicklaus wirth described the first software engineering method as stepwise refinement

b. stepwise refinement follows its existence from 1971

c. it is a top down approach

d. all of the mentioned

  • d. all of the mentioned

Q. What is incorrect about structural design?

a. structural design introduced notations and heuristics

b. structural design emphasis on procedural decomposition

c. the advantage is data flow representation

d. it follows structure chart

  • c. the advantage is data flow representation

Q. What is the solution for Structural design?

a. the specification model following data flow diagram

b. procedures represented as bubbles

c. specification model is structure chart showing procedure calling hierarchy and flow of data in and out of procedures

d. emphasizing procedural decomposition

  • c. specification model is structure chart showing procedure calling hierarchy and flow of data in and out of procedures

Q. Which of the following is an incorrect method for structural design?

a. transition of problem models to solution models

b. handling of larger and more complex products

c. designing object oriented systems

d. more procedural approach

  • b. handling of larger and more complex products