Top 350+ Solved Software Testing and Quality Assurance (STQA) MCQ Questions Answer
Q. The detailed study of existing system is referred to as :
a. system planning
b. system analysis
c. feasibility study
d. design dfd
Q. Prototyping aims at :
a. end user understanding and approval
b. program logic
c. program logic
d. none of these
Q. What is a prototype ?
a. mini-model of existing system
b. mini-model of the proposed system
c. working model of the existing system
d. none
Q. Select the method which clears all selected entries in Web Driver Selenium
a. dselectall()
b. deselect_al()
c. dselect_al()
d. deselectall()
Q. Method which selects the option which displays the text matching the parameter passed to it
a. selectvisiblete xt()
b. selectbyvisible text()
c. select_visiblet ext()
d. select_byvisibl etext()
Q. Out of the following which is not a wait comand
a. waitfortitle
b. waitfortextpre sent
c. waitforactive
d. waitforalert
Q. Select the command which retrieves the alert message and stores it in a variable that you will specify
a. storealert
b. storedalert
c. store_alert
d. storesalert
Q. Select the method which performs a context-click at the curent mouse location
a. click_context()
b. context.click()
c. contextclick()
d. context_click()
Q. Test automation tool can be expensive and usually employed in cambination with____.
a. system testing
b. b.software tesating
c. manual testin
d. beta testing
Q. which test are important to exercise code functiojnality without touching any dependency
a. system test
b. b.code test
c. unit test
d. manual test
Q. Which automation testing is a key area in testing processes.
a. performance testing
b. b.functional testing
c. d.load testing
d. stress testing
Q. ____testing is the process of evaluating the application performance.
a. load testing
b. b.stress testing
c. performanc e testing
d. functional testing
Q. Identifying the Current business practices with respect to automation in the target organisation involves in which test
a. current state
b. b.future state
c. gap analysis
d. business case
Q. Which automation framework step is based on the inputprovided by the gap analysis.
a. work plan
b. b.businesscase
c. requirement anlysiss
d. riskmanagement