Top 350+ Solved Software Testing and Quality Assurance (STQA) MCQ Questions Answer
Q. ------------- means under what test environment(Hardware, software set up. the application will run smoothly
a. test bed
b. checkpoint
c. code walk through
d. checklist
Q. TQM represents
a. tool quality management
b. test quality manager
c. total quality management
d. total quality manager
Q. Optimization, Defect Prevention, and Quality Control. Its come under the
a. cmm level 2
b. cmm level 3
c. cmm level 4
d. cmm level5
Q. A Plan to overcome the risk called as
a. migration plan
b. master plan
c. maintenance plan
d. mitigation plan
Q. Which of the following is not included in failure costs?
a. rework
b. repair
c. failure mode analysis
d. none of the mentioned
Q. Which requirements are the foundation from which quality is measured?
a. hardware
b. software
c. programmers
d. none of the mentioned
Q. Which of the following is not a SQA plan for a project?
a. evaluations to be performed
b. amount of technical work
c. audits and reviews to be performed
d. documents to be produced by the sqa group
Q. Degree to which design specifications are followed in manufacturing the product is called
a. quality control
b. quality of conformance
c. quality assurance
d. none of the mentioned
Q. Which of the following is not an appraisal cost in SQA?
a. inter-process inspection
b. maintenance
c. quality planning
d. testing
Q. Who identifies, documents, and verifies that corrections have been made to the software?
a. project manager
b. project team
c. sqa group
d. all of the mentioned
Q. What is not included in prevention costs?
a. quality planning
b. formal technical reviews
c. test equipment
d. equipment calibration and maintenance