Q. ------------- means under what test environment(Hardware, software set up. the application will run smoothly

a. test bed

b. checkpoint

c. code walk through

d. checklist

  • a. test bed

Q. TQM represents

a. tool quality management

b. test quality manager

c. total quality management

d. total quality manager

  • c. total quality management

Q. Optimization, Defect Prevention, and Quality Control. Its come under the

a. cmm level 2

b. cmm level 3

c. cmm level 4

d. cmm level5

  • d. cmm level5

Q. Unit Testing will be done by

a. testers

b. end users

c. customer

d. developers

  • d. developers

Q. Beta testing will be done at

a. user place

b. developers place

  • a. user place

Q. A Plan to overcome the risk called as

a. migration plan

b. master plan

c. maintenance plan

d. mitigation plan

  • d. mitigation plan

Q. Which of the following is not included in failure costs?

a. rework

b. repair

c. failure mode analysis

d. none of the mentioned

  • d. none of the mentioned

Q. Which requirements are the foundation from which quality is measured?

a. hardware

b. software

c. programmers

d. none of the mentioned

  • b. software

Q. Which of the following is not a SQA plan for a project?

a. evaluations to be performed

b. amount of technical work

c. audits and reviews to be performed

d. documents to be produced by the sqa group

  • b. amount of technical work

Q. Degree to which design specifications are followed in manufacturing the product is called

a. quality control

b. quality of conformance

c. quality assurance

d. none of the mentioned

  • b. quality of conformance

Q. Which of the following is not an appraisal cost in SQA?

a. inter-process inspection

b. maintenance

c. quality planning

d. testing

  • c. quality planning

Q. Who identifies, documents, and verifies that corrections have been made to the software?

a. project manager

b. project team

c. sqa group

d. all of the mentioned

  • c. sqa group

Q. What is not included in prevention costs?

a. quality planning

b. formal technical reviews

c. test equipment

d. equipment calibration and maintenance

  • d. equipment calibration and maintenance

Q. Quality Management in software engineering is also known as

a. sqa

b. sqm

c. sqi

d. sqa and sqm

  • a. sqa