Top 350+ Solved Software Project Management (SPM) MCQ Questions Answer
Q. Which of the following is not a Software Configuration Management Activity?
a. configuration item identification
b. risk management
c. release management
d. branch management
Q. The definition and use of configuration management standards is essential for quality certification in
a. iso 9000
b. cmm
c. cmmi
d. all of the mentioned
Q. What involves preparing software for external release and keeping track of the system versions that have been released for customer use?
a. system building
b. release management
c. change management
d. version management
Q. Which of the following process ensures that versions of systems and components are recorded and maintained?
a. codeline
b. configuration control
c. version
d. workspace
Q. Which of the following process is concerned with analyzing the costs and benefits of proposed changes?
a. change management
b. version management
c. system building
d. release management
Q. Which of the following is not a Version management feature?
a. version and release identification
b. build script generation
c. project support
d. change history recording
Q. Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems?
a. agile method
b. parallel compilation method
c. large systems method
d. all of the mentioned
Q. Which of the following is not a build system feature?
a. minimal recompilation
b. documentation generation
c. storage management
d. reporting
Q. Which of the following is a configuration item?
a. design & test specification
b. source code
c. log information
d. all of the mentioned
Q. Which of the following is a part of system release?
a. electronic and paper documentation describing the system
b. packaging and associated publicity that have been designed for that release
c. an installation program that is used to help install the system on target hardware
d. all of the mentioned
Q. A sequence of baselines representing different versions of a system is known as
a. system building
b. mainline
c. software configuration item(sci)
d. none of the mentioned
Q. “Robustness” answers which of the following description?
a. case tools be used to support the process activities
b. process errors are avoided or trapped before they result in product errors
c. defined process is acceptable and usable by the engineers responsible for producing the software
d. process continues in spite of unexpected problems
Q. In which stage of process improvement bottlenecks and weaknesses are identified?
a. process measurement
b. process analysis
c. process change
d. none of the mentioned