Q. In block diagrams, relationship betweencomponents is shown by

a. Boxes

b. Ovals

c. Circular

d. Lines/Arrows

  • d. Lines/Arrows

Q. Cities, states and country can be defined as

a. Subsystem – Cities, states: System – country

b. Subsystem – state :System– country, cities

c. Subsystem – Country: System– cities, state

d. Subsystem– Country, state: System– Cities

  • a. Subsystem – Cities, states: System – country

Q. Which of the following is correct system design process ?

a. Identify system requirement – define system – develop system

b. Define system – develop system – identify system

c. Identify system – develop system – operate system

d. None of these

  • c. Identify system – develop system – operate system

Q. Making different sub-system to work together is

a. System definition

b. System operation

c. System integration

d. System decomposition

  • c. System integration

Q. System procurement process involves

a. Specifying system requirement

b. Choosing suppliers

c. A and B both

d. None of these

  • c. A and B both

Q. System decommissioning normally takes place

a. At the beginning of the development process

b. At the middle of the development process

c. After the end of useful operational time

d. At the beginning of the useful operational time

  • c. After the end of useful operational time

Q. System operation takes place after

a. System specification

b. System design

c. System installation

d. System decomposition

  • c. System installation

Q. Software processes are

a. Activities involved in producing software system

b. Activities involved in selling software systems

c. Activities involved in system design

d. Activities involved in managing systems

  • a. Activities involved in producing software system

Q. Iterative model includes

a. Waterfall model

b. Sequential model

c. Incremental development

d. Random model

  • d. Random model

Q. In iterative process model, software process represents

a. Sequential activities

b. Cycle of activities

c. Random activities

d. None of these

  • b. Cycle of activities

Q. In spiral development the software process form

a. Sequences

b. Loops

c. Zigzag

d. None of these

  • b. Loops

Q. Spiral development involves

a. Risk assessment

b. Reduction of risk

c. A and B both

d. None of these

  • c. A and B both

Q. Requirement Engineering involves

a. Feasibility studies

b. Requirement analysis

c. Requirement validation

d. All the above

  • d. All the above

Q. Analysis and design workbench

a. It supports system modeling during the analysis and design stages of the software process

b. Organization responsible for approving U.S. standards

c. Stimuli that occurs irregularly

d. Formalized set of software calls and routines that can be referenced by an application program in order to access supporting system or network services

  • a. It supports system modeling during the analysis and design stages of the software process

Q. ANSI (American National Standards Institute) is

a. It supports system modeling during the analysis and design stages of the software process

b. Organization responsible for approving U.S. standards

c. Stimuli that occurs irregularly

d. Formalized set of software calls and routines that can be referenced by an application program in order to access supporting system or network services

  • b. Organization responsible for approving U.S. standards