Top 1000+ Solved Software Engineering MCQ Questions Answer

From 436 to 450 of 956

Q. Which one is not a product quality factor of McCall quality model?(

a. Product revision

b. Product operation

c. Product specification

d. Product transition

  • c. Product specification

Q. The second level of quality attributes in McCall quality model are termed as(

a. quality criteria

b. quality factors

c. quality guidelines

d. quality specifications

  • a. quality criteria

Q. Which one is not a level in Boehm software quality model?(

a. Primary uses

b. Intermediate constructs

c. Primitive constructs

d. Final constructs

  • d. Final constructs

Q. Which one is not a software quality model?(

a. McCall model

b. Boehm model

c. ISO 9000

d. ISO 9126

  • c. ISO 9000

Q. Basic execution time model was developed by(

a. Bev.Littlewood

b. J.D.Musa

c. R.Pressman

d. Victor Baisili

  • d. Victor Baisili

Q. NHPP stands for

a. Non Homogeneous Poisson Process

b. Non Heterogeneous Poisson Process

c. Non Homogeneous Poisson Product

d. Non Heterogeneous Poisson Product

  • a. Non Homogeneous Poisson Process

Q. ) CMM level 1 has(

a. 6 KPAs

b. 2 KPAs

c. 0 KPAs

d. None of the above

  • c. 0 KPAs

Q. MTBF stands for

a. Mean time between failure

b. Maximum time between failures

c. Minimum time between failures

d. Many time between failures

  • a. Mean time between failure

Q. )CMM model is a technique to(

a. Improve the software process

b. Automatically develop the software

c. Test the software

d. All of the above

  • a. Improve the software process

Q. Total numbers of maturing levels in CMM are(

a. 1

b. 3

c. 5

d. 7

Q. Reliability of software is dependent on number of errors(

a. removed

b. remaining

c. both (a) & (b)

d. None of the above

  • b. remaining

Q. Reliability of software is usually estimated at(

a. Analysis phase

b. Design phase

c. Coding phase

d. Testing phase

  • d. Testing phase

Q. CMM stands for

a. Capacity maturity model

b. Capability maturity model

c. Cost management model

d. Comprehensive maintenance model

  • b. Capability maturity model

Q. Which level of CMM is for basic project management?(

a. Initial

b. Repeatable

c. Defined

d. Managed

  • b. Repeatable
Subscribe Now

Get All Updates & News