Top 1000+ Solved Software Engineering MCQ Questions Answer

From 361 to 375 of 956

Q. If requirements are easily understandable and defined, which model is best suited?(

a. Waterfall model

b. Prototyping model

c. Spiral model

d. None of the above

  • a. Waterfall model

Q. If requirements are frequently changing, which model is to be selected?(

a. Waterfall model

b. Prototyping model

c. RAD model

d. Iterative enhancement model

  • b. Prototyping model

Q. If user participation is available, which model is to be chosen?(

a. Waterfall model

b. Iterative enhancement model

c. Spiral model

d. RAD model

  • d. RAD model

Q. If limited user participation is available, which model is to be selected?(

a. Waterfall model

b. Spiral model

c. Iterative enhancement model

d. any of the above

  • d. any of the above

Q. If project is the enhancement of existing system, which model is best suited?(

a. Waterfall model

b. Prototyping model

c. Iterative enhancement model

d. Spiral model

  • c. Iterative enhancement model

Q. Which one is the most important feature of spiral model?(

a. Quality management

b. Risk management

c. Performance management

d. Efficiency management

  • b. Risk management

Q. Most suitable model for new technology that is not well understood is:(

a. Waterfall model

b. RAD model

c. Iterative enhancement model

d. Evolutionary development model

  • d. Evolutionary development model

Q. Statistically, the maximum percentage of errors belong to the following phase of SDLC(

a. Coding

b. Design

c. Specifications

d. Installation and maintenance

  • c. Specifications

Q. Which phase is not available in software life cycle?(

a. Coding

b. Testing

c. Maintenance

d. Abstraction

  • d. Abstraction

Q. The development is supposed to proceed linearly through the phase in(

a. Spiral model

b. Waterfall model

c. Prototyping model

d. None of the above

  • b. Waterfall model

Q. The outcome of construction phased can be treated as:(

a. Product release

b. Beta release

c. Alpha release

d. All of the above

  • b. Beta release

Q. Which one is not a step of requirement engineering?(

a. Requirements elicitation

b. Requirements analysis

c. Requirements design

d. Requirements documentation

  • c. Requirements design

Q. Requirements elicitation means(

a. Gathering of requirements

b. Capturing of requirements

c. Understanding of requirements

d. All of the above

  • d. All of the above

Q. SRS stands for

a. Software requirements specification

b. System requirements specification

c. Systematic requirements specifications

d. None of the above

  • a. Software requirements specification

Q. SRS document is for(

a. “What” of a system?

b. How to design the system?

c. Costing and scheduling of a system

d. System’s requirement.

  • a. “What” of a system?
Subscribe Now

Get All Updates & News