Q. Quality practices must be carried out ______________at the start of the project (Solved)
1. throw-out the life of the project
2. at the end of the project
3. no need to carry out quality practices
4. all
- a. throw-out the life of the project
1. throw-out the life of the project
2. at the end of the project
3. no need to carry out quality practices
4. all