Q. A manager and the head of engineering discuss a change to a major work package. After the meeting, the manager contacts you and tells you to complete the paperwork to make the change. This is an example of: (Solved)
1. Management attention to scope management.
2. Management planning.
3. A project expediter position.
4. A change control system.
- c. A project expediter position.