Q. The following steps are involved in developing an HRIS: -(i) Systems design(ii) System testing and implementation(iii) Preliminary system analysis(iv) System monitoring and evaluation(v) System engineering (Solved)
1. i, ii, iii, iv and v
2. iii, i, v, ii and iv
3. iii, v, i, ii and iv
4. iii, i, ii, v and iv
- b. iii, i, v, ii and iv