Request New Subject
Home
Civil Engineering
Estimating and Costing
Q. The detention period in a septic tank is assumed (Solved)
1. 20 minutes
2. 25 minutes
3. 30 minutes
4. 40 minutes
c. 30 minutes
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe