Q. In ___________ phase roles are identified and responsibilities assigned. (Solved)
1. project planning.
2. gap analysis.
3. reengineering.
4. configuration.
- a. project planning.
1. project planning.
2. gap analysis.
3. reengineering.
4. configuration.