Q. The three performance related measures are _________. (Solved)
1. system, hardware and software.
2. quality, quantity and product design.
3. cost, time and benefits.
4. hardware, software and product design.
- c. cost, time and benefits.
1. system, hardware and software.
2. quality, quantity and product design.
3. cost, time and benefits.
4. hardware, software and product design.