Q. The Planning phase of a formal review includes the following:
a. Explaining the objectives
b. Selecting the personnel, allocating roles.
c. Follow up
d. Individual Meeting preparations
Q. A Person who documents all the issues, problems and open points that were identifiedduring a formal review.
a. Moderator.
b. Scribe
c. Author
d. Manager
Q. Who are the persons involved in a Formal Review?i. Managerii. Moderatoriii. Scribe / Recorderiv. Assistant Manager
a. i,ii,iii,iv are true
b. i,ii,iii are true and iv is false.
c. ii,iii,iv are true and i is false.
d. i,iv are true and ii, iii are false.
Q. Which of the following is a Key Characteristics of Walk Through?
a. Scenario, Dry Run, Peer Group
b. Pre Meeting Preparations
c. Formal Follow Up Process
d. Includes Metrics
Q. Which of the following term describes testing?
a. Finding broken code
b. Evaluating deliverable to find errors
c. A stage of all projects
d. None of the mentioned
Q. What type of fault remains in the system for some period and then disappears?
a. Permanent
b. Transient
c. Intermittent
d. Non-Permanent
Q. Which of the following approaches are used to achieve reliable systems?
a. Fault prevention
b. Fault removal
c. Fault tolerance
d. All of the mentioned
Q. A system maintaining its integrity while accepting a temporary halt in its operation is saidto be in a state of
a. Full Fault Tolerance
b. Graceful Degradation
c. Fail Soft
d. Fail Safe
Q. Which of the following Error Detection checks is not a part of Application detection?
a. Hardware checks
b. Timing checks
c. Reversal checks
d. Coding checks
Q. Exception handling is a type of
a. Forward error recovery mechanism
b. Backward error recovery mechanism
c. Top recovery mechanism
d. Bottom recovery mechanism
Q. All fault-tolerant techniques rely on
a. Integrity
b. Dependability
c. Redundancy
d. Inter-dependability
Q. It is imperative for communicating processes to reach consistent recovery points to avoid the _________ effect, with backward error recovery mechanism.
a. Static
b. Dynamic
c. Domino
d. Whirlpool
Q. What do you understand by V&V in software testing?
a. Verified Version
b. Version Validation
c. Verification and Validation
d. Version Verification
Q. When does the testing process stops?
a. When resources (time and budget) are over
b. When some coverage is reached
c. When quality criterion is reached
d. Testing never ends.
Q. Quality also can be looked at in terms of user satisfaction which includes
a. A compliant product
b. Good quality output
c. Delivery within budget and schedule
d. All of the mentioned