Top 150+ Solved Software Quality Management (SQM) MCQ Questions Answer

From 76 to 90 of 186

Q. __________does look at the implementation details.

a. Unit testing.

b. Loop testing.

c. Functional testing.

d. Structural testing.

  • d. Structural testing.

Q. In ___________, the program or system is treated as a black box.

a. unit testing.

b. Loop testing.

c. Functional testing.

d. Stress testing.

  • c. Functional testing.

Q. Test should be conducted for every possible _______.

a. dat(a)

b. Case.

c. Variable.

d. All the above.

  • d. All the above.

Q. The ______ associated with testing will be called test factors.

a. Test phase.

b. Test result.

c. Risk.

d. Test dat

  • c. Risk.

Q. Which of the following statements is NOT true?

a. A good design methodology should provide a clear division of design from implementation.

b. A good design methodology should not promote a top-down decomposition strategy.

c. A good design methodology should encourage phased development of the software.

d. A good design methodology should help to minimize future maintenance.

  • b. A good design methodology should not promote a top-down decomposition strategy.

Q. Formal Reviews seek to ______.

a. Identify system faults, but not to attribute blame or seek solutions.

b. Identify system faults, attribute the source of errors, but not seek solutions.

c. Identify system faults, attribute the source of errors and seek solutions.

d. Identify system faults, seek solutions, but not to attribute blame.

  • c. Identify system faults, attribute the source of errors and seek solutions.

Q. __________ relates to the ability of the software to be transferred to a different environment.

a. Portability.

b. Maintainability.

c. Reliability.

d. Efficiency.

  • a. Portability.

Q. Which of the following statements is NOT true?

a. Requirements must be testable.

b. Requirements must be concerned with system functionality only.

c. Requirements must be complete.

d. Requirements must be unambiguously state

  • c. Requirements must be complete.

Q. Which of the following is NOT part of a software quality assurance plan?

a. Reference documents.

b. Configuration Action.

c. Supplier Control.

d. Customer Control.

  • c. Supplier Control.

Q. Who is NOT usually present in a technical review?

a. User.

b. Quality Enginer

c. The programming tools supplier.

d. Specialist with knowledge of the application.

  • c. The programming tools supplier.

Q. COCOMO is ________.

a. Constructive Common Model.

b. Constructive Cost Model.

c. Constructive Collaborative Model.

d. Constructive Comparative Model.

  • b. Constructive Cost Model.

Q. The expectancy theory of motivation will focus on ________.

a. Instrumentality.

b. Reliability.

  • a. Instrumentality.

Q. Size and Complexity are a part of

a. Product Metrics

b. Process Metrics

c. Project Metrics

d. Cost Metrics

  • a. Product Metrics

Q. Cost and schedule are a part of

a. Product Metrics

b. Process Metrics

c. Project Metrics

d. Assignment specification

  • c. Project Metrics