Top 150+ Solved Software Quality Management (SQM) MCQ Questions Answer

From 136 to 150 of 186

Q. Testing comes under which category of cost of quality?

a. Preventive

b. Appraisal

c. Failure

d. None of the above

  • b. Appraisal

Q. Cost of quality is

a. Prevention costs

b. Appraisal costs

c. Failure costs

d. All of the above

  • b. Appraisal costs

Q. What is the verification process in software development?

a. The probability that undesirable things will happen such as loss of human life or large financial losses.

b. The process of monitoring the software to ensure full compliance with established standards and procedures

c. The process of trying to discover every conceivable fault or weakness in a work product.

d. The process of evaluating a system or component to determine whether or not the products of a given development phase satisfy the conditions imposed at the start of that phase.

  • d. The process of evaluating a system or component to determine whether or not the products of a given development phase satisfy the conditions imposed at the start of that phase.

Q. Reporting Discrepancies as incidents is a part of which phase:

a. Test Analysis and Design

b. Test Implementation and execution

c. Test Closure Activities

d. Evaluating exit criteria and reporting

  • b. Test Implementation and execution

Q. The approach/document used to make sure all the requirements are covered when writing test cases

a. Test Matrix

b. Checklist

c. Test bed

d. Traceability Matrix

  • d. Traceability Matrix

Q. Executing the same test case by giving the number of inputs on same build called as

a. Regression Testing

b. Retesting

c. Ad hoc Testing

d. Sanity Testing

  • b. Retesting

Q. To check whether we are developing the right product according to the customerrequirements are not. It is a static process

a. Validation

b. Verification

c. Quality Assurance

d. Quality Control

  • b. Verification

Q. To check whether we have developed the product according to the customer requirementsare not. It is a Dynamic process.

a. Validation

b. Verification

c. Quality Assurance

d. Quality Control

  • a. Validation

Q. _________describes how the skills and experience of the project team members will bedeveloped.

a. Staff development plan

b. Staff removal plan

c. Quality management plan

d. Quality assurance Plan

  • a. Staff development plan

Q. It is a set of levels that defines a testing maturity hierarchy

a. TIM (Testing Improving Model)

b. TMM (Testing Maturity Model)

c. TQM (Total Quality Management)

d. none

  • b. TMM (Testing Maturity Model)

Q. A Non-Functional Software testing done to check if the user interface is easy to use and understand

a. Usability Testing

b. Security Testing

c. Unit testing

d. Block Box Testing

  • a. Usability Testing

Q. The review and approved document (i.e. Test plan, System Requirement Specification’s)is called as

a. Delivery Document

b. Baseline Document

c. Checklist

d. none

  • b. Baseline Document

Q. What are the Testing Levels?

a. Unit Testing

b. Integration Testing

c. System Testing and Acceptance Testing.

d. All the above

  • d. All the above

Q. Cost of quality = Prevention Cost + Appraisal cost + ________

a. Failure cost

b. Maintenance cost

c. Error Cost

d. HR cost

  • a. Failure cost