Top 150+ Solved Design of Reinforced Cement Concrete Elements MCQ Questions Answer
Q. footing can be calculated.
a. bending moment and shear force
b. bearing pressure
c. none of the mentioned
d. all of the mentioned
Q. In conventional design, allowable bearing capacity should be taken smaller than which of the following value?
a. safe bearing capacity and allowable bearing pressure
b. the pressure intensities beneath the footing
c. none of the mentioned
d. all of the mentioned
Q. In cohesive soil, the pressure distribution beneath the footing is
a. linear
b. non linear
c. zero
d. none of the mentioned
Q. When do strap footings are used in foundation?
a. to transfer load of an isolated column
b. distance between the columns are long
c. two column loads are unequal
d. all of the mentioned
Q. When two column loads are unequal, which of the possible footing can be provided?
a. strap footing
b. raft footing
c. trapezoidal combined footing
d. mat footing
Q. If the wall or column under construction is near some other property, it will not be possible to spread the footing to both the sides of War or column. In search case which footing is used?
a. simple pad footing
b. eccentric footing
c. isolated footing
d. reinforced footing
Q. Identify the given footing below.
a. strip footing
b. combine footing
c. reinforced footing
d. isolated footing
Q. Identify the given footing below.
a. continuous footing
b. cantilever footing
c. strip footing
d. combine footing
Q. Identify the given footing below.
a. cantilever footing
b. continuous footing
c. strip footing
d. pad footing
Q. Identify the given footing below.
a. simple pad footing
b. steeped footing
c. strip footing
d. stepped pad footing
Q. Identify the type of foundation below.
a. wall footing
b. combine footing
c. grillage footing
d. strap footing
Q. Which type of footing is applicable when the wall carries light loads or when the safe bearing pressure is very high?
a. simple strip footing
b. stepped footing
c. simple pad footing
d. eccentric footing
Q. A system in which water is supplied only for fixed few hours, such system is called
a. closed
b. intermittent
c. combined
d. lift