Top 350+ Solved Concrete Technology and Design MCQ Questions Answer

From 76 to 90 of 317

Q. The load factors for live load and dead load are taken respectively as

a. 1.5 and 2.2

b. 2.2 and 1.5

c. 1.5 and 1.5

d. 2.2 and 2.2

  • b. 2.2 and 1.5

Q. The mixture of different ingredients of cement, is burnt at

a. 1000°c

b. 1200°c

c. 1400°c

d. 1600°c

  • c. 1400°c

Q. The percentage of voids in cement is approximately

a. 25 %

b. 40 %

c. 60 %

d. 80 %

  • b. 40 %

Q. Water required per bag of cement, is

a. 7 kg

b. 14 kg

c. 21 kg

d. 35 kg

  • d. 35 kg

Q. For an ordinary Portland cement

a. residual does not exceed 10% when sieved through is sieve no. 9

b. soundness varies from 5 to 10 mm

c. initial setting time is not less than 30 minutes

d. compressive stress after 7 days, is not less than 175 kg/cm2

  • c. initial setting time is not less than 30 minutes

Q. Pozzolana cement is used with confidence for construction of

a. dams

b. massive foundations

c. r. structures

d. all the above

  • d. all the above

Q. Pick up the correct statement from the following:

a. calcium chloride acts as a retarder

b. calcium chloride acts as an accelerator

c. gypsum (calcium sulphate) acts as a retarder

d. both (b) and (c)

  • d. both (b) and (c)

Q. The operation of removing humps and hollows of uniform concrete surface, is known as

a. floating

b. screeding

c. trowelling

d. finishing

  • b. screeding

Q. 1% of voids in a concrete mix would reduce its strength by about

a. 5 %

b. 10 %

c. 15 %

d. 20 %

  • a. 5 %
Subscribe Now

Get All Updates & News